Before the Truck Arrives
📋 Pre-Delivery Checklist
- Access roads are firm (especially after rain)
- Overhead clearance is at least 14 feet
- No soft shoulders where trucks could sink
- Dump location is clearly marked
- Gate is unlocked and wide enough
Texas Reality Check
Texas rain + soft ground = stuck trucks. If it rained recently, check your access route before delivery day.
End Dump vs Tandem Truck
Choosing the wrong truck type is one of the top causes of delivery delays.
🚛 End Dump Trucks
- Higher capacity
- Need more room to operate
- Require solid dumping surface
- Best for: Large, open sites
🚚 Tandem Trucks
- More maneuverable
- Better for tight residential sites
- Lower risk on softer ground
- Best for: Driveways, backyards
Staging Material the Smart Way
If you need material spread over a large area:
- Request multiple piles
- Avoid blocking driveways or access points
- Think ahead for equipment movement
Drivers aren't mind readers — clarity saves time.
Weather Reality (Houston Area)
If rain is forecast:
- Compact immediately after placement if possible
- Don't dump into standing water
- Consider smaller loads to reduce rutting
Bad timing ruins good material.
Pro Tip
A five-minute conversation before dispatch prevents 90% of delivery issues. We see it daily. When in doubt, call us and we'll help you plan.